01291 672 253 enquiries@mou.org.uk

Morgan’s of Usk were proud to be involved in this prestigious office development in the centre of Cardiff for main Contractors ISG and developers Rightacres.

1,200 tonnes of steelwork along with metal decking and edge protection were supplied to this 8 floor multi storey column and beam frame which had a maximum height of 44m. To provide maximum efficiency the main 17m span floor beams were fabricated as plate girders. Stability of the frame was provided by the central insitu concrete lift shafts which had cast in plates at each floor to connect to the frame. An innovative bolt on Tee bracket was developed by MOU to eliminate site welding. Erection of the main frame was completed 4 weeks ahead of schedule.